Kyabra Street
Light weight scaffold required from level 3 podium to rectify fire damaged façade. Quite a challenging project as there was limited space for scaffold on podium, scaffold had to be taken to full height before moving to next area.
Banana Bender
This iconic structure required ground up scaffold for re-roofing after hail damage. Special consideration was required to ensure the pub was able to remain operational during these works. Public safety an especially important aspect.
Southbank
Specialised cantilevered scaffolds were built overhanging the foot path & road below. Premier scaffolds tailored an engineered access solution for the client for re-cladding works. Road closures were necessary during scaffolding works over road.